Allocated Cost Calculator calculator can be used to determine the cost allocated to a specific project or department based on the total cost and the percentage of the cost allocated.
Learn how to use the Allocated Cost Calculator calculator and its working principles
The calculator uses the formula: Allocated Cost = Total Cost × (Allocation Percentage / 100). This formula helps in determining the cost allocated to a specific project or department based on the total cost and the percentage of the cost allocated.