Cost Per Job Calculator

Calculate the cost per job by entering labor hours, materials, and overhead expenses

Input Parameters

Calculation Results

Calculation Formula

Total Cost = (Labor Hours × Hourly Wage) + Material Cost + (Overhead Rate × (Labor Hours × Hourly Wage))

Where:
- Labor Hours: Number of hours worked on the job
- Hourly Wage: Cost per hour of labor
- Material Cost: Direct material expenses
- Overhead Rate: Additional costs as percentage of labor

Labor Cost

$0.00

Overhead Cost

$0.00

Total Cost

$0.00

Cost Per Job Calculator Calculator Usage Guide

Learn how to use the Cost Per Job Calculator to estimate project costs effectively

How to Use This Calculator

  1. Enter the number of labor hours required for your job
  2. Input your standard labor hourly wage
  3. Enter any direct material costs for the job
  4. Set your overhead rate (typically 15-30% for most businesses)
  5. Click the "Calculate" button to see your estimated costs

Understanding the Results

The calculator provides three key metrics:

  • Labor Cost: Total wages for all workers on the job
  • Overhead Cost: Indirect costs based on your labor cost
  • Total Cost: The complete project cost estimate

Practical Applications

This calculator is useful for:

  • Quoting projects for clients
  • Bidding on jobs
  • Tracking profitability
  • Setting budgets
  • Comparing different project estimates

Example Scenario

Suppose you need to bid on a landscaping job that requires:

  • 10 labor hours
  • $25 per hour wage
  • $300 for materials
  • 20% overhead

Using the calculator with these inputs would show:

  • Labor Cost: $250.00
  • Overhead Cost: $50.00
  • Total Cost: $300.00

This would allow you to quote $300 for the job, ensuring you cover all costs while maintaining your desired profit margin.